Vineland Municipal Electric Utility owns and operates two (2) generating units. VMEU’s peak load is 164.1 MW and is currently capable of generating 120 MW.

The last few years have seen a decided move towards renewable power generation throughout the city. The first utility grade project to be completed was Vineland Solar One, a 4 MW solar field located on sewerage authority property which has been in operation since the summer of 2009. Since then, VMEU has contracted for four (4) more solar projects throughout the city bringing the grand total to 16 MW of renewable power under contract which saves over $1.2 million annually in capacity, energy, and transmission costs. These utility solar projects are in addition to almost 18 MW of customer behind the meter and grid solar projects within the city.

VMEU’s core value is to keep the Electric Utility city owned maintaining the utility jobs and economic stimulus provided by the utility to the community.

VMEU will continue to invest in standardized efficient peaking gas turbine generating units to replace existing aging units and to keep pace with load growth.

Chief Stationary Engineer

(856) 794-4000, ext. 4236

Joseph S. Isabella

Supervisor of Interconnection

(856) 794-4000, ext. 4388

Email

Quick Navigation To Other City Entities

City Home
Police Department
Fire Department
Health Department
Economic Development
Skip to content